As you can see the cement was poured today – this morning actually. I asked Adam, one of the workers, what the white stick thing was for. He said the top of represented the pour line – the bottles were placed on it to protect our doggies if they happened to fall in a hole. Mr Contractor is a dog lover, too.
Peanut stepped in the hole at lunchtime and left her prints. Mr Contractor assured us it was not a problem – he was there at lunch when she did it. Not sure what if any work will be done tomorrow – I’m reckoning that the concrete needs to dry a little before more is done. But if there is more work done – you know that I’ll report it here first.
We’re pleased with the progress so far. Booya!